School Lockers Image

Locker Fitout at Secondary School

Springfield completed a high-quality locker fit-out at Malmesbury School, resolving ongoing issues with damaged and low-quality locker systems.

Our Challenge

The key challenge at Malmesbury School was replacing a failing locker system that had suffered repeated damage and was no longer fit for a high-traffic school environment. The school needed a robust, long-term solution that could withstand daily wear and tear while maximising the available space. Careful site surveying and strategic space planning were essential to design a layout that improved functionality without disrupting the school’s operations, ensuring the new installation delivered both durability and efficiency.

After testing our durable SGL lockers, the school opted for a full installation, impressed by their resilience and suitability for a busy school environment.

The Outcome

We managed the project from start to finish, including a detailed site survey and space planning to create a layout that maximized functionality.

The result is a secure, long-term storage solution that provides students with reliable lockers and offers the school peace of mind through enhanced durability and design.

Get A Free No Obligation Quote

Looking for something similar? Tell us about it

This field is for validation purposes and should be left unchanged.
Your Name(Required)
Please state your requirements, our team will respond ASAP

Contact Details

Old Gloucester Road, Knap, Thornbury, South Gloucestershire, BS35 3UF

Back to top